Menu
2026-04-14 Dr. Edward Sun

#995 2024 Apr., Dr Sun Took a key role in "Assembly procedure of a 500 mm2 steel-wire-armored XLPE-insulated cable", TAIWAN

Cover
2024 Apr., Dr Sun Took a key role in "Assembly procedure of a  500 mm2 steel-wire-armored XLPE-insulated cable"

Step 1: Pull the cables to the proper distance next to all Switch Gears and tighten the cables.

Step 2: Strip the outer Sheath of cables; bend and tighten the steel wires on cables; also tighten the whole cables.

Step 3: Strip the second sheath; also, cut the whole head of cables to the proper length.
Step 4: Connect ports to the prepared cables; put on individual labels.

Completed.  

Share this: